-
SHELAA 2020 - HL55 - Focus Area 2: Bohemia
SHELAA 2020
This page contains site details included in our SHELAA prepared for our Local Plan (2021) consultation which closed on 24 March 2021. Information relating to the 2026 Regulation 18 Draft Local Plan Consultation is expected to be available soon.Site reference: HL55
Site name: SummerfieldsFocus Area/Strategic Policy: Focus Area 2: Bohemia
Use: Residential led mixed use including community/cultural and smaller scale office/light industrial uses (subject to relocation of the leisure centre)
Indicative capacity (net residential dwellings/floorspace): 250
Site specific development considerations based on draft Local Plan policies:
Development on this site should:
-
Provide 25% affordable housing required in line with policy SP2
-
Be part of a comprehensive or coordinated development of Bohemia, subject to the relocation of the existing leisure centre
-
Create a network of green infrastructure and opportunities to play on site
-
Retain mature trees on site and include measures to protect Summerfields Wood Local Nature Reserve
-
Relocate existing civic functions
- Incorporate cycle and pedestrian routes to Hastings Town Centre, Summerfields Woods, Amhurst Gardens, the Bohemia and Tower Local Centre, Central St Leonards and the seafront
The following image shows a map of the site boundary
© Crown Copyright and database rights [2020]. OS [100021328]. Use of this data is subject to terms and conditions. You are granted a non-exclusive, royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes for the period during which Hastings Borough Council makes it available. You are not permitted to copy, sub-license, distribute, sell or otherwise make available the Licenced Data to third parties in any form. Third party rights to enforce the terms of this licence shall be reserved to OS.
-
-
Consultation Draft New Local Plan 2019 - 2039 Site Allocations
Contact
Contact us if you have a question about planning.
Comments
The content on this page is the responsibility of our Planning team.
