-
-
FOI request (FOIR-440593436)
ECO4 Flex as part of ECO4 Order
Requested Fri 29 July 2022
Responded Tue 22 November 2022I would like to make a Freedom of Information request for Responsible Person Contact Details for ECO4 Flex declarations as per the ECO4 Order.
Background
In Ofgem’s ‘Ofgem ECO4 Administration Consultation Part 2’ detailed at https://www.ofgem.gov.uk/publications/ofgem-eco4-administration-consultation-part-2 'Chapter 6' of the consultation sets out the intention for ECO4 Flex under the ECO4 Order.
In Chapter 6 the consultation says from July 2022 Councils will be required to issue a SoI and a dedicated responsible person would need to sign the declaration. The relevant part of the publication is:
6.21. From 1 July, a new SoI will be required from LAs across GB to state their intent to participate in ECO4 Flex and a commitment that the signing LA officer will check and verify that declarations will be issued for households that match the criteria in the SoI. As with ECO3 SoIs, these would need to be signed by the CEO or dedicated responsible person.
Relevant legislation
The Electricity and Gas (Energy Company Obligation) Order 2022 at https://www.legislation.gov.uk/ukdsi/2022/9780348236606/part/1?fbclid=IwAR1NwvIWKeVLdfdqz7-l-RZxp-uGy8OSxwF-ei6w6ge52Aok8EIG3llshNg
Freedom of Information Request
The Freedom of Information Request that I am making is as follows:
1. Please could you provide details of the CEO or dedicated responsible person referred to in the consultation above. Requested details for the Responsible Person include- Full Name
- Job Title
- Email address
- Telephone number
- Address
2. Please can you advise on whether you
2a Accept applications from all appropriately Registered Installers
or
2b Accept applications from a defined list of installers (if this is the case please can you provide details)
Response
Please accept my apologies for the delay in responding.
Hastings Borough Council do not hold the data requested.
The status of the Electricity and Gas (Energy Company Obligation) Order 2022 number 875 appears to still be in draft and we certainly have not accepted applications from appropriately Registered Installers or from a defined list of Installers.
- Full Name
-
-
Freedom of Information
Contact
Contact us if you have a question about democratic services.
Comments
The content on this page is the responsibility of our Democratic Services team.